McAfee Secure sites help keep you safe from identity theft, credit card fraud, spyware, spam, viruses and online scams
My Cart (0)  

Oracle 1z0-1075-24

1z0-1075-24

Exam Code: 1z0-1075-24

Exam Name: Oracle Manufacturing Cloud 2024 Implementation Professional

Updated: Sep 11, 2026

Q&A Number: 52 Q&As

1z0-1075-24 Free Demo download:

PDF Version Demo PC Test Engine Online Test Engine

Already choose to buy "PDF"

Price: $59.99 

About Oracle 1z0-1075-24 Exam dumps / Bootcamp

Failing the Oracle Manufacturing Cloud 2024 Implementation Professional exam means paying the registration fee all over again. A set of 52 updated 1z0-1075-24 practice questions from Dumpkiller costs far less than a retake — a smart investment for 2026 candidates.

Oracle 1z0-1075-24 Exam Overview:

Certification Vendor:Oracle
Exam Name:Oracle Manufacturing Cloud 2024 Implementation Professional
Exam Number:1Z0-1075-24
Available Languages:English
Passing Score:68%
Real Exam Qty:50
Exam Format:Multiple Choice
Related Certifications:Oracle Manufacturing Cloud Implementation Professional
Exam Duration:90 minutes
Exam Price:USD 245
Sample Questions: DOWNLOAD DEMO
Exam Way:Online proctored or at an authorized testing center
Pre Condition:None required; foundational knowledge of Oracle Cloud manufacturing practices recommended
Official Syllabus URL:https://education.oracle.com/oracle-manufacturing-cloud-2024-implementation-professional/pexam_1Z0-1075-24

Oracle 1z0-1075-24 Exam Syllabus Topics:

SectionObjectives
Topic 1: Manage Work Definitions- Manage item structures
- Define operations and materials
- Create and maintain work definitions
Topic 2: Oracle Manufacturing Cloud Overview- Describe Manufacturing Cloud capabilities
- Explain key features and functions
Topic 3: Execute Production- Manage material and resource transactions
- Handle scrap and exceptions
- Execute production transactions
Topic 4: Set up Manufacturing- Manage work areas and resources
- Configure plant parameters
- Set up work centers
Topic 5: Costing and Inventory Foundations- Describe inventory setup for manufacturing
- Explain costing methods and configurations
Topic 6: Manufacturing Integrations- Understand integration with Inventory Management
- Understand integration with Cost Management
- Manage costing foundations
Topic 7: Set up Reporting and Analytics- Configure manufacturing reports
- Use analytics for production monitoring
Topic 8: Create Work Orders- Create and release work orders
- Manage work order status and lifecycle

What Candidates Ask About the Oracle 1z0-1075-24 Exam

Can you give me an overview of the 1z0-1075-24 exam?

The Oracle Manufacturing Cloud 2024 Implementation Professional exam (code: 1z0-1075-24) is the official Oracle exam that leads to the Oracle Cloud certification. It sits at the Professional level of the Oracle certification track. It is also connected with related credentials such as Oracle Manufacturing Cloud Implementation Professional. Passing it proves to employers that your skills have been validated by Oracle itself, which is why the 1z0-1075-24 credential keeps showing up in job postings.

How many questions are in the 1z0-1075-24 exam, and how long does it take?

The Oracle Manufacturing Cloud 2024 Implementation Professional exam gives you 90 minutes to work through 50. Pacing matters more than most candidates expect, so before exam day, run at least one full timed session in the Dumpkiller test engine to learn how long you can afford per question. If an item stalls you, flag it and move on — coming back later beats burning five minutes on a single question.

What score do I need to pass the 1z0-1075-24 exam, and how much does it cost?

The passing score for the Oracle Manufacturing Cloud 2024 Implementation Professional exam is 68%, and the official registration fee is USD 245. Remember that a failed attempt means paying that fee in full again, so a timed self-assessment with Dumpkiller practice questions about a week before your exam date is a cheap way to confirm you are scoring comfortably above 68%.

Are there any prerequisites for the 1z0-1075-24 exam?

According to Oracle, the following applies: None required; foundational knowledge of Oracle Cloud manufacturing practices recommended. Certification policies do change from time to time, so confirm the latest requirements on the official exam page at https://education.oracle.com/oracle-manufacturing-cloud-2024-implementation-professional/pexam_1Z0-1075-24 before you register.

Can I try the 1z0-1075-24 practice questions before buying?

Yes. Dumpkiller offers a free 1z0-1075-24 PDF demo so you can review the question style, difficulty, and explanations before committing to anything. After purchase, your Oracle Manufacturing Cloud 2024 Implementation Professional material includes 365 days of free updates, and if your product expires after that, you can extend the update service at a 50% discount from your member zone.

What happens if I do not pass the 1z0-1075-24 exam, and how is my order delivered?

If you take the corresponding 1z0-1075-24 exam within 60 days of your purchase and do not pass, you can apply for a full refund under our 100% Money Back Guarantee, subject to a few conditions: the failed exam must be the one matching your purchase; sitting the exam within 3 days of purchase does not qualify, since that leaves too little preparation time; downloading the material without actually taking the exam does not qualify; free materials and expired orders are excluded; and the candidate name must match the payer name. To apply, send a scanned copy of your enrollment slip together with your official Score Report (PDF) within 2 days after the exam, and claims are processed within 7 days. If you would rather not take a refund, you can exchange your purchase for two free products of equal value while keeping the update service on the product you originally bought. As for delivery, everything is an instant download: your products are sent to your email within one minute of payment — contact customer service if nothing arrives within 2 hours — and there is no limit on the number of computers you can install the software on.

What topics are covered in the 1z0-1075-24 exam?

The official Oracle Manufacturing Cloud 2024 Implementation Professional syllabus is organized into 8 main domains. The first three are Create Work Orders, Manage Work Definitions, and Set up Manufacturing. For the full domain-by-domain breakdown, see the complete Exam Topics outline above.

Oracle Manufacturing Cloud 2024 Implementation Professional Sample Questions:

Question #1

Which three actions can a supervisor perform to annul or correct mistakes in a completed work order, committed by a user while entering work order details?

A. Reverse from Scrap to Ready.
B. Reverse at an operation.
C. Correct the Product entered at work order.
D. Reverse the product at the last operation.
E. Reverse a Closed order to Open.


Question #2

In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.
What is the reason for this?

A. Purchase components PI and P2 are not associated with the material cost plan of the Cost Planning Scenario.
B. Create Accounting was not initiated.
C. Costs for purchase components PI and P2 are not defined In Cost Accounting.
D. Create Accounting Distributions was not initiated.


Question #3

Your client's company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.
You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.
Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?

A. If the e-record is rejected, you can optionally resubmit the rejected electronic records.
B. These capabilities are supported for discrete and process work orders.
C. It generates e-records on initial work order release through UI and sends notifications to approvers.
D. Using a deferred approval process with notifications, the work order is held in "Released" status until the approvals are obtained.


Question #4

A Production Operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Which task should the operator select to review all the transactions in a single place for both work order and orderless execution?

A. Manage Work Orders
B. Review Dispatch List
C. Report Resource, Material, and Operation Transactions
D. Review Production Transaction History


Question #5

Which three can you set as Overcompletion Tolerance Type and its value for a subcomponent yield, so that the job order can report the excess production completion?

A. Overcompletion Tolerance Type = Amount; value > 0
B. Overcompletion Tolerance Type = Amount; value = 0
C. Overcompletion Tolerance Type = Percentage; value > 0
D. Overcompletion Tolerance Type = Percentage; value = 100
E. Overcompletion Tolerance Type = Percentage; value = 0


Solutions:

Question #1
Answer: A,B,D
Question #2
Answer: A
Question #3
Answer: D
Question #4
Answer: D
Question #5
Answer: A,C,D

1051 Customer ReviewsCustomers Feedback (* Some similar or old comments have been hidden.)

Blessed with remarkable success in exam 1z0-1075-24!

James

James     4.5 star  

I got 95% marks in the 1z0-1075-24 certification exam. I studied for the exam from the pdf dumps by Dumpkiller. Amazing work. Suggested to all.

Clarence

Clarence     4 star  

Yes, just as what you promised, all of them are real questions.
Passd 1z0-1075-24

Hedy

Hedy     5 star  

Excellent practise exam software. I couldn't prepare for a lot of time but the exam practising software helped me pass my 1z0-1075-24 exam with good scores. Thank you Dumpkiller.

Ward

Ward     4 star  

Exam practising software proved to be value for money. Thank you Dumpkiller for providing such guidance. Advice to all to prepare with the practise exam software in order to get good marks. I got 93% in the 1z0-1075-24 certification exam.

Cherry

Cherry     4.5 star  

I was able to pass by using the 1z0-1075-24 exam questions, which was recommend by one of my friend as he bought all his exam materials from Dumpkiller. Good luck!

Iris

Iris     5 star  

This 1z0-1075-24 examination is quite important for me. Everyone thought I would fail the 1z0-1075-24 exam and this 1z0-1075-24 learning braindump was just in time to help me pass it. Yeah, I am happy to say I passed now!

Clyde

Clyde     4.5 star  

Latest dumps for 1z0-1075-24 certfication at Dumpkiller. Great study material in the pdf files. Suggested to all.

Nat

Nat     4.5 star  

Thanks for your great Oracle 1z0-1075-24 practice questions.

Joshua

Joshua     4.5 star  

Thank you so much team Dumpkiller for developing the exam questions and answers file . Passed my 1z0-1075-24 exam in the first attempt. Exam answers file is highly recommended by me.

Marshall

Marshall     5 star  

Thanks for valid 1z0-1075-24 dumps. I did well in my exam.

Claire

Claire     4 star  

Guys this exam is still valid, not all questions but it might be enough to pass.

Gerald

Gerald     4 star  

I am sure now that your 1z0-1075-24 questions are the real questions.

Miles

Miles     4.5 star  

I passed 1z0-1075-24 exam today! With the help of 1z0-1075-24 practice questions, you can have a good understanding of exam questions and you can answer them. Thanks!

Philip

Philip     5 star  

Your 1z0-1075-24 manual is really good!
Thanks so much.

Addison

Addison     4 star  

I wrote my 1z0-1075-24 exam today and I got 95% grades, studied using this 1z0-1075-24 exam braindump. Keep up the good work Dumpkiller! I am very greatful to you! All my thanks!

Hilda

Hilda     4.5 star  

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Contact US:  
 [email protected]  Support

Free Demo Download

Guarantee & Refund Policy
Popular Vendors
Adobe
Alcatel-Lucent
Avaya
BEA
CheckPoint
CIW
CompTIA
CWNP
EC-COUNCIL
EMC
EXIN
Hitachi
HP
ISC
ISEB
Juniper
Lpi
Network Appliance
Nortel
Novell
SASInstitute
Sybase
Symantec
The Open Group
all vendors
Why Choose DumpKiller Testing Engine
 Quality and ValueDumpKiller Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
 Tested and ApprovedWe are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
 Easy to PassIf you prepare for the exams using our DumpKiller testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
 Try Before BuyDumpKiller offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.